A couple of things have been accomplished at our house the last couple of days. They placed the bottom plate (pieces of 2x4 that will anchor the studded walls when they are built) along the perimeter of the house.
Today they installed the plumbing. White tubing is for drains, sewer, gray-water. Blue (cold) and Red (hot) tubing is also noticeable in the picture. Those two black "boxes" in the foreground will be the drain basins for the shower and tub in our master bedroom.
Tomorrow we meet with the builder to go over the construction timeline. We are looking forward to this meeting to discuss the details of the construction process as well as ask some questions. Our concrete slab should be poured soon!